Test Plan Development Skill

Purpose

The Test Plan Development skill provides comprehensive capabilities for developing mechanical test plans including objective definition, test configuration, instrumentation planning, and data analysis procedures.

Capabilities

  • Test objective and success criteria definition
  • Test configuration specification
  • Instrumentation and data acquisition planning
  • Load and environmental condition specification
  • Safety analysis and risk assessment
  • Test procedure development
  • Data analysis plan creation
  • Test report template generation

Usage Guidelines

Test Planning Framework

Test Objective Definition

  1. Verification vs Validation

    TypeQuestionPurpose
    VerificationBuilt correctly?Meets specifications
    ValidationBuilt the right thing?Meets user needs
  2. Test Categories

    • Development testing (design iteration)
    • Qualification testing (design approval)
    • Acceptance testing (production verification)
    • Certification testing (regulatory compliance)
  3. Success Criteria

    Pass/Fail criteria must be:
    - Measurable and quantitative
    - Traceable to requirements
    - Unambiguous
    - Defined before testing
    

Test Configuration

Test Article Definition

  1. Configuration Control

    • Part number and revision
    • Serial number
    • Manufacturing records
    • Deviations from design
  2. Pre-Test Condition

    • Dimensional verification
    • Surface condition
    • Prior test history
    • Environmental exposure

Test Setup

  1. Boundary Conditions

    Fixture requirements:
    - Simulate actual mounting
    - Minimize artificial constraints
    - Allow access for instrumentation
    - Safe for failure modes
    
  2. Load Introduction

    • Point loads vs distributed
    • Static vs dynamic
    • Load path verification
    • Fixture compliance effects

Instrumentation Planning

Strain Measurement

TypeApplicationAccuracy
Foil gageGeneral purpose+/- 1%
RosetteUnknown principal direction+/- 1%
Clip gageLarge strains+/- 0.5%
DICFull-field+/- 2%

Displacement Measurement

TypeRangeAccuracy
LVDT+/- 50 mm+/- 0.1%
String pot0-2000 mm+/- 0.5%
Laser0-500 mm+/- 0.01%
Dial indicator0-50 mm+/- 0.02 mm

Force/Load Measurement

Load cell selection:
- Capacity: 1.5-2x expected maximum
- Accuracy: Class 0.1 or better for critical
- Type: Tension, compression, universal
- Environmental: Temperature, humidity range

Acceleration Measurement

TypeRangeBandwidth
Piezoelectric+/- 500 g1 Hz - 10 kHz
MEMS+/- 50 gDC - 1 kHz
Capacitive+/- 10 gDC - 100 Hz

Data Acquisition

Sampling Requirements

Nyquist criterion: f_sample >= 2 * f_max

Practical guideline: f_sample >= 5-10 * f_max

For transient events:
- Sample at 10x highest frequency content
- Include anti-aliasing filter

Channel Planning

  1. Channel List

    • Channel ID
    • Measurement type
    • Sensor type
    • Location
    • Expected range
    • Calibration requirements
  2. Data Management

    • File naming convention
    • Storage requirements
    • Backup procedures
    • Archive policy

Test Procedures

Procedure Structure

1. Scope and applicability
2. Reference documents
3. Safety requirements
4. Equipment and materials
5. Pre-test setup
6. Test execution steps
7. Data recording requirements
8. Post-test procedures
9. Acceptance criteria
10. Reporting requirements

Safety Considerations

  1. Hazard Analysis

    • Energy sources
    • Failure modes
    • Personnel exposure
    • Environmental impact
  2. Risk Mitigation

    • Barriers and shields
    • Emergency stops
    • Warning systems
    • PPE requirements

Data Analysis Plan

Analysis Methods

Data TypeAnalysis MethodOutput
Static load-displacementLinear regressionStiffness
Stress-strainOffset methodYield strength
FatigueS-N curve fitLife equation
VibrationFFT, modal fitFrequencies, damping

Uncertainty Analysis

Combined uncertainty:
u_c = sqrt(sum(u_i^2))

Expanded uncertainty (95%):
U = k * u_c (k = 2 for 95%)

Sources:
- Calibration uncertainty
- Resolution
- Environmental effects
- Repeatability

Process Integration

  • ME-021: Test Plan Development

Input Schema

{
  "test_article": {
    "part_number": "string",
    "description": "string",
    "quantity": "number"
  },
  "requirements": {
    "specifications": "array of requirement IDs",
    "success_criteria": "array"
  },
  "test_type": "development|qualification|acceptance|certification",
  "test_conditions": {
    "loads": "array of load cases",
    "environments": "array of conditions",
    "duration": "string"
  },
  "resources": {
    "facility": "string",
    "equipment": "array",
    "personnel": "array"
  }
}

Output Schema

{
  "test_plan": {
    "document_number": "string",
    "revision": "string",
    "test_matrix": "array of test cases",
    "instrumentation_list": "array",
    "schedule": "object"
  },
  "test_procedures": "array of procedure references",
  "safety_analysis": {
    "hazards": "array",
    "controls": "array",
    "approval_required": "boolean"
  },
  "data_analysis_plan": {
    "methods": "array",
    "acceptance_criteria": "array"
  },
  "resource_requirements": {
    "cost_estimate": "number",
    "duration": "number (days)",
    "personnel": "array"
  }
}

Best Practices

  1. Define success criteria before testing
  2. Verify instrumentation calibration
  3. Document all deviations from plan
  4. Include margin in load capacity
  5. Plan for potential failure modes
  6. Review procedures with test team

Integration Points

  • Connects with Requirements Flowdown for test requirements
  • Feeds into Test Correlation for model validation
  • Supports Design Review for verification evidence
  • Integrates with FAI Inspection for first article