Changeover Optimizer

Overview

The Changeover Optimizer skill provides comprehensive capabilities for reducing setup and changeover times. It supports SMED (Single-Minute Exchange of Die) methodology, sequence optimization, and changeover time tracking.

Capabilities

  • Internal/external setup separation
  • Changeover video analysis
  • Parallel task identification
  • Standardization opportunities
  • Quick-release mechanisms
  • Sequence optimization
  • Changeover matrix
  • Time reduction tracking

Used By Processes

  • LEAN-004: Kanban System Design
  • CAP-002: Production Scheduling Optimization
  • LEAN-003: Kaizen Event Facilitation

Tools and Libraries

  • Video analysis tools
  • SMED templates
  • Time study software
  • Scheduling optimization

Usage

skill: changeover-optimizer
inputs:
  equipment: "Injection Molding Press 5"
  current_changeover_time: 120  # minutes
  target_changeover_time: 30
  changeover_data:
    video_analysis: "changeover_video_url"
    task_breakdown:
      - task: "Remove old mold"
        time: 15
        type: "internal"
      - task: "Get new mold from storage"
        time: 20
        type: "internal"
      - task: "Install new mold"
        time: 25
        type: "internal"
      - task: "Connect utilities"
        time: 15
        type: "internal"
      - task: "Adjust parameters"
        time: 25
        type: "internal"
      - task: "Run test shots"
        time: 20
        type: "internal"
outputs:
  - current_state_analysis
  - internal_external_separation
  - improvement_opportunities
  - optimized_procedure
  - changeover_matrix
  - implementation_plan

SMED Methodology

Stage 1: Separate Internal and External Setup

TypeDefinitionGoal
InternalMust stop machineMinimize
ExternalMachine runningMaximize

Stage 2: Convert Internal to External

  • Pre-stage tools and materials
  • Pre-heat/pre-cool components
  • Prepare documentation
  • Pre-adjust settings

Stage 3: Streamline All Operations

  • Parallel tasks (multiple operators)
  • Eliminate adjustments
  • Standardize procedures
  • Use quick-release mechanisms

Changeover Analysis

Current State:
- Total time: 120 minutes
- Internal: 100 minutes
- External: 20 minutes

Improvement Opportunities:
1. Move mold retrieval to external: -20 min
2. Pre-heat mold: -10 min
3. Use quick-clamps: -15 min
4. Parallel connection work: -10 min
5. Eliminate test shots: -15 min

Target State:
- Total time: 30 minutes
- Internal: 25 minutes
- External: 35 minutes

Changeover Matrix

From / ToProduct AProduct BProduct C
Product A-30 min45 min
Product B35 min-25 min
Product C40 min30 min-

Quick Changeover Techniques

TechniqueApplication
Quick-release clampsReplace bolts
Intermediate jigsPre-positioned tooling
Color codingVisual identification
One-turn fastenersReduce turns required
Standardized heightsEliminate adjustments
Preset gaugesEliminate measurement

Implementation Steps

  1. Document current state (video)
  2. Separate internal/external
  3. Convert internal to external
  4. Streamline internal setup
  5. Streamline external setup
  6. Standardize and train
  7. Track and improve